The proposed project is the implementation of the 2030 Airport Master Plan (AMP). The project elements in the AMP are the focus of the EIR document that is required by CEQA. The EIR describes the proposed project, the existing environmental conditions, the impacts from construction and operation of the proposed project as well as mitigation measures to reduce or eliminate impacts.